Han Yua,
Qingzhe Jiang*a,
Zhaozheng Songa,
Qian Maa,
Bo Yuanb and
Huanxi Xiongb
aState Key Laboratory of Heavy Oil Processing and Beijing, China University of Petroleum, Beijing 102249, P. R. China. E-mail: jiangqingzhe@163.com; Tel: +86 10 89733372
bResearch Institute of Safety & Environment Technology, China National Petroleum Corporation, Beijing 102206, China
First published on 26th October 2017
Taking advantage of coalbed methane as a substitute for coal fuel can facilitate CO2 reduction in addition to CO2 sequestration. Here, the CO2 reduction potential and economic impact of CO2 recovery of methane from a coalbed were evaluated at a CTO plant in the Inner Mongolia Autonomous Region of China. Emission reductions and capital, annual, and methane costs were analyzed basing on engineering data, empirical formulas, and assumptions. Cost analysis included the influence of a potential carbon tax. In addition, a sensitivity analysis was conducted on the annual gross profit to parameters, including carbon tax, CO2 capture rate (CCR), pipeline distance, capital recovery factor, CO2 injection rate, operation and maintenance (O&M) percentage, coal depth, and methane price. Results showed that an optimal CO2 capture rate is about 80%, taking into consideration total capital, annual, and methane costs. At this optimum CCR, the methane price was calculated as $0.12 Nm−3 and a total capital cost of $323.14 M, which also results in a 58% reduction in CO2 emissions. Reductions from CO2 sequestration and fuel substitution respectively account for 66% and 34% of the total emissions reductions. The carbon tax impact analysis suggests a carbon tax greater than $20 per tCO2 will maintain a profitable system with a range in CCR of 70–80%. The sensitivity analysis demonstrates that carbon tax, CCR, and pipeline distance have the greatest effects on annual gross profit.
Fig. 1 Profile of major energy production in China since 2006.3 |
The CTO process has clear advantages in product cost based on the low price of feedstock.4 However, CTO technology suffers from high CO2 emissions, which urgently needs to be addressed in the context of the international political environment. CO2 mitigation methods have primarily focused on fuel balance and switching, technology upgrades, and CO2 capture for sequestration or utilization.5–10 Among these, CO2 sequestration has been verified as an effective approach because it can reduce CO2 at a larger scale than other options. Carbon capture and storage (CCS), CO2 enhanced coalbed methane (CO2-ECBM), and CO2 enhanced oil recovery (CO2-EOR) are three major technologies which have received increasingly attention in recent years.
All the three processes have similar key sub-processes: (1) CO2 collection and pretreatment; (2) CO2 compression and transportation; and (3) geologic injection. The CO2 sources include industries related to generation of power, production of cement, iron and steel, and coal chemicals as well as chemical refineries.11 Different technologies for gas pretreatment have been adopted due to varying CO2 concentrations in the flue gas resulting in different corresponding carbon capture costs. For onshore CO2 transportation, pipeline and tanks are the two primary modes. Results demonstrate that for longer distances, pipeline transportation is relatively more cost-effective due to its larger CO2 loading capacity.12 With regard to the CO2 geologic injection procedure involved in the CO2-EOR and CO2-ECBM projects, it is much higher in complexity than the first two sub-processes. Tables 1 and 2 show the criteria for CO2-EOR and CO2-ECBM projects.13
Criteria | Miscible | Immiscible |
---|---|---|
Capacity | >4 Mt | |
Reservoir type | Sandstones and carbonates | |
Rock wettability | Water wet of week oil wet | |
Depth | >450 m | 600–900 |
Thickness | <40 m | 10–20 m |
Temperature | 60–121 °C | >35 |
Pressure | > minimum miscibility and < fracture pressures | >7.5 MPa |
Porosity | >3% | >3% |
Permeability | >5 mD | >0.1 mD |
Caprock thickness | >10 m | >10m |
Oil density | <0.88 | >0.9 |
Oil viscosity | <10 mPa s | 10–1000 |
Oil saturation | >0.3 | 0.3–0.7 |
Criteria | Suitable condition |
---|---|
Capacity | >1 Mt |
Thickness | >10 m |
Depth | 300–1500 m |
Temperature | >35 °C |
Pressure | >7.5 MPa |
Porosity | >5% |
Permeability | >1 mD |
Caprock thickness | >10 m |
Ash content | <25% |
Methane content | 2.5–50 m3 t−1 |
Coal rank | 0.6–1.5% |
As is evident, the CO2-EOR and CO2-ECBM processes as well as the economic performances are sensitive to parameters like oil density, oil viscosity, permeability, methane content, and well depth. According to Dahowski,14 the net costs pertaining to the large CO2 point sources in China range from less than −$60 to more than $200 per ton of CO2 stored. Sun et al.13 concluded that CO2-EOR could be considered the most favorable CCUS technology that deserves highest priority for development in the short and medium term. Kay Damen et al.15 made a comparison between the four CO2-EOR and CO2-ECBM projects. Results showed that the CO2 mitigation costs ranged between −3 to 19 €/t CO2 and 5 to 6 €/t CO2, respectively that ratified promising prospects for both the CO2 reduction methods.
Here, a notable point is that the methane gas generated from the CO2-ECBM process can become a source of revenue as feedstock or fuel, with minimal processing; this gives the process a comparative advantage over the CO2-EOR process and other CCS processes.
The CO2-ECBM process has been studied extensively. A feasibility study on ECBM recovery and CO2 storage was conducted in Southeast Qinshui Basin, China by Zhou et al.16 Wong et al.17 evaluated the conceptual economic performance of a full-scale CO2-ECBM project and concluded that it showed promising prospects for deployment. A laboratory and simulation investigation of ECBM recovery by CO2 injection was conducted by Fulton et al.18 that demonstrated an increase in the gas recovery efficiency from 36% to 132% with an increase in CO2 pressure from 0.34 to 1.41 MPa. An experimental study conducted by Philipp Weniger et al.19 revealed that the CO2 sorption capacities exceeded the methane sorption capacities by a factor of 1.9–6.9 for the coal samples extracted from the Paraná Basin, Brazil. A.S. Ranathunga,20 in his study, concluded that compared to natural recovery, CO2 flooding can significantly increase the CH4 production from low-rank coal seams. However, most of the related researches are on an experimental level. The few field level studies that have been conducted related to CO2-ECBM processes are presented in Table 3; they reveal that the impact of CO2 injection on CH4 recovery is definitely positive at the field level, although it may vary according to operating conditions and geological settings. A broad body of literature is also available on ECBM theory and mechanisms in detail.21–24 Most scholars have focused more on coalbed methane production and have only evaluated the CO2 reduction potential from the perspective of CO2 sequestration; very few studies have evaluated the benefits of the produced methane.25,26
Scale | Location | Key findings | Ref. |
---|---|---|---|
Field test | San Juan Basin, USA | Gas recovery was enhanced from 77–95% by CO2 injection | Reeves27 |
Field test | Upper Silesian Basin, Poland | 55–70% increase of gas production | Bergen28 |
Micro-piolet test | Ishikari Coal Basin, Japan | Methane production was enhanced by 2–3 times | Fujioka29 |
Micro-piolet test | Qinshui Basin, China | Methane production was enhanced by 2.5–15 times | Wong10 |
In this study, a system consisting of CO2 capture and compression, CO2 pipeline transport, CO2-ECBM processing, and methane pipeline transport was constructed (see Fig. 2). Taking advantage of the produced methane to displace coal fuel in the CTO plant boilers have the potential for additional CO2 reduction because methane is much cleaner than fuel coal. A particular CTO plant in China was selected as the study site and the adjacent Ordos Basin was chosen for the CO2-ECBM field option. CO2 resources for ECBM processing were derived from the CTO plant emissions. The produced methane was sent back to substitute for the fuel coal in the CTO plant boilers, which offered a novel low carbon option for the CTO plant. The CO2 reduction potential and corresponding economic performance were evaluated.
A CTO plant in Baotou City, Inner Mongolia Autonomous Region of China was selected as study site. The plant was put into production in 2011 with an olefin capacity of 0.7 Mt/a, which made it the first and largest CTO commercial scale facility.30 According to the literature,31 the total emission of the CTO plant was near 6 Mt CO2/a. Table 4 shows the CO2 emission sources as percentages of total emissions. The Rectisol unit accounted for the most emissions, 60.1% of the total, with a CO2 concentration of 88.1%. Boiler flue gas accounted for 36.4% of total emissions, but the CO2 concentration was as low as 6.0%. Because the two sources accounted for 96.5% of total emissions, they were the main focus of CO2 reduction. CO2 flue gas emissions from the MTO regenerator, sulfur recovery, and steam superheater accounted for the remaining 3.5%.
CO2 sources | Value (Mt/a) | CO2 concentration (%) | Portion (%) |
---|---|---|---|
Rectisol unit | 3.60 | 88.1 | 60.1 |
MTO regenerator flue gas | 0.11 | 21.0 | 2.0 |
Sulfur recovery flue gas | 0.06 | 28.1 | 1.0 |
Steam superheater flue gas | 0.03 | 9.5 | 0.5 |
Boiler flue gas | 2.18 | 6.0 | 36.4 |
Total | 5.98 | 100.0 |
The treated CO2 was sent to the gas field in the Ordos Basin through a pipeline. With an area of 25 × 104 km2, the Ordos Basin is the second largest sedimentary basin in China;32 it is a few hundred kilometers south of Baotou City (see Fig. 3). The basin has the largest proven reserves of natural gas with >500 × 109 m3 in newly confirmed annual reserves.33,34 Six gas fields, Jingbian, Daniudi, Shenmu, Sulige, Zizhou, and Yulin, with >1000 × 108 m3 of proven reserves have been found in the basin to date.35 Table 5 presents basic information on the main gas fields in the Ordos Basin;36,37 it can be noted that most of the fields possess low permeability and high averaged coal layer thickness, indicating that perfect gas sealing conditions are possible. In this study, no specific gas field was identified so the CO2 transport distance varied. The produced methane was transported back to the CTO plant by pipeline.
Fig. 3 Location of the CTO plant in Baotou City, Inner Mongolia Autonomous Region of China, and the CO2-ECBM field in the Ordos Basin. |
Gas fields | Porosity (%) | Permeability (mD) | Thickness (m) | Gas saturation (%) |
---|---|---|---|---|
Jingbian | 4.5–7.4 | 0.6–5.5 | 3.1–8.1 | 77% |
Daniudi | 6.0–10.6 | 0.4–1.0 | 5.3–14.8 | 22% |
Shenmu | 7.5–7.8 | 0.6–2.5 | 5.8–8.8 | 33% |
Sulige | 7.0–11.0 | 0.5–1.0 | 4.9–11.5 | 22% |
Zizhou | 5.8–8.5 | 0.7–1.3 | 6.6–9.0 | 67% |
Yulin | 6.0–6.6 | 1.8–8.2 | 6.5–10.8 | 35% |
Before the economic analysis, a preliminary safety evaluation needs to be performed. Adaptive capacity performance as per the operating conditions differs significantly from one gas field to another due to the differences in geological settings. The main safety risks comprise leakage, pipeline corrosion, and reservoir fracture; the first two risks can be managed effectively through monitoring and maintenance.
However, the third risk, i.e., reservoir fracture, is relatively more complex to manage. It is related to geological characteristics and operating pressure. We use Daniudi gas field as an example. Its caprock is a set of 180–300 m thick lacustrine clastic mudstones with a single layer of thickness up to 30–50 m. The minimum values of porosity and permeability are 6.0% and 0.4 mD, respectively, indicating that the reservoirs have good sealing efficiency and a stable regional distribution. The overpressure was estimated to be as high as 20–25 MPa; much higher than the general CO2-ECBM operating pressure.38,39 As is shown in Table 5, most of the gas fields in the Ordos Basin have similar characteristics of low porosity, permeability and likewise. This fact indicates that the preliminary safety requirements for a CO2-ECBM process in the Ordos Basin are met. However, there is a need of a detailed empirical investigation, along with a process simulation, and pilot test specific to the gas reservoir before an actual CO2-ECBM process is undertaken.
Throughout the process, net CO2 sequestration underperforms the theoretical calculations. This difference is due to CO2 losses in the capturing and purifying process, leakages in pipelines, and parasitic CO2 produced from energy use. Therefore, the net CO2 sequestered in coalbed was set at 79% of the total CO2 based on calculations by Wong.17
The amount of CO2 reduction from fuel switching was calculated on the basis of low heat value and carbon content per GJ. The low heat value and carbon content for coal fuel are 14.08 GJ t−1 and 28.00 × 10−3 t C/GJ, respectively. The low heat value and carbon content for the produced methane are 389.31 GJ/104 Nm3 and 15.30 × 10−3 t C/GJ, respectively.3,40
These costs were estimated based on the method described by McCollum and Ogden.41 This approach adopts a combination of 5-stage compression plus pumping to increase the CO2 pressure from atmospheric pressure to 15.0 MPa for transportation. An additional parallel compressor train was needed, and the calculated compression power was more than 40000 kW due to the limits of the single compressor maximum power. The compression power calculating formulas for each stage are as follows:
(1) |
Ws-total = (Ws)1 + (Ws)2 + (Ws)3 + (Ws)4 + (Ws)5 | (2) |
(3) |
Power needs for boosting the pressure of the dense phase CO2 to the final 15.0 MPa outlet pressure were estimated as follows:
(4) |
The capital cost of the compressor and pump was based on the following equations:42
mtrain = (1000 × m)/(24 × 3600 × Ntrain) | (5) |
(6) |
Cpump = [(1.11 × 106) × (Wp/1000)] + 0.07 × 106 | (7) |
I = 77854 × m0.4055 × L + 595704 | (8) |
Cwell = 1000000 × 0.127e0.0008z + 530.7 | (9) |
(10) |
Cannual = Ctotal capital × CRF + CO&M + Cenergy | (11) |
Cmethane = Cannual/Pmethane | (12) |
The CTO plant and CO2-ECBM process were assumed to operate 8000 hours annually. The pipeline length for CO2 and methane were set to 200 km for the base case.
No boosters were considered for CO2 and methane pipeline transport. For CO2 transport, the pressure drops may be fairly small for short distance transportation. For methane transport, the methane can be delivered back to the CTO plant by taking advantage of the high pressure during methane production.
We also assumed that every 1 molecule of methane production requires 2 molecules of CO2 injection, and no breakthrough will occur for the lifetime of the CO2-ECBM process.
All costs are expressed in U.S. dollars and converted to 2015 dollars by using the Chemical Engineering Plant Cost Index without taking tax into account.60 The exchange rate between US dollars and RMB was set to 6.39 according to the average exchange rate of 2015.61
As shown in Fig. 4, the CO2 sequestration curve is linear because CO2 reduction was calculated based on a fix percentage. The reduction from switching fuels continues to increase until the CCR reaches 59.4%, subsequently, no further reductions from switching fuels occurs, which causes a slight decrease in the total reduction trend. At a CCR of 59.4%, the fuel coal used for CTO plant boilers has been totally substituted with coalbed methane. Nonetheless, it is evident that the total emission reduces significantly as the CCR increases. For example, the total emission drops from 5.98 Mt/a to 2.52 Mt/a when CCR is 80%, which represents a 58% CO2 reduction in emissions, of which 34% is contributed from switching fuels.
Fig. 5 Variations in total capital and constituent costs and costs normalized to capture capacity with changing CCR. |
The capital cost per unit of CO2 capture capacity was selected as the economic index. As shown in Fig. 5, capital costs per unit of CO2 capture capacity decreases dramatically when the CO2 capture rate increases from 10% to 80%; CCR greater than 80% shows no additional cost benefit. Therefore, from the perspective of capital cost, the capture rate should be set to 80%.
To gain a better insight into the impact of each constituent cost, a breakdown of capital cost items for the CCRs of 70%, 80%, and 90% are shown in Fig. 6–8; this highlights the variations around the threshold CCR of 80%. As shown, capital cost proportions for CCR 70% and 80% follow the same ranking: CO2 pipeline, wells and infrastructures, methane pipeline, and CO2 capture and compression in order of decreasing capital cost. For a CCR of 80%, the capital cost for CO2 pipeline accounts for 33.17% of the total cost, while wells and infrastructure capital cost account for 32.96%, and methane pipeline and CO2 compression account for 19.38% and 14.49%, respectively. However, for a CCR of 90%, the capital costs for wells and infrastructure are dominant, followed by CO2 pipeline, CO2 capture and compression, and methane pipeline.
As Fig. 9 indicates, annual costs increase with increasing CCR, with an increase in annual cost rate at the CCR threshold of 80%. This observation reiterates that the optimal CCR ranges between 80% and 90%, which was found in the previous capital cost results. This range provides economically reasonable annual costs.
Energy and well and infrastructure costs show large changes in annual cost growth. The 10% and 80% CCRs were taken as examples to compare the proportional changes (see Fig. 10). As shown, annual costs from the methane pipeline accounts for the highest proportion (33.6%) at a CCR of 10%, followed by CO2 pipeline costs of 25.0% and energy costs of 12.6%. In comparison, at a CCR of 80%, energy costs account for the highest proportion of annual costs (37.6%), followed by CO2 pipeline costs of 18.3% and wells and infrastructure costs of 18.1%. Clearly, energy use becomes the dominant cost as CCR increases. In addition, the CO2 capture rate has relatively greater influence on annual cost than those from CO2 and methane pipelines, wells and infrastructures, O&M, and CO2 capture and compression.
To obtain a better understanding of the economic performance, the cost per cubic meter ($ Nm−3) of methane was evaluated (see Fig. 11). Clearly, the unit volume cost drops conspicuously prior to CCR 60%, after which the downward trend flattens until the trend goes up for CCR greater than 80%. This indicates that the optimal CCR is between 70–80%, slightly different than the optimal value derived from annual costs. When the CCR was set as 80%, the cost for per cubic meter of methane was as low as $0.12 Nm−3. This is much cheaper than the current market price of Chinese methane, which is about $0.30 Nm−3.
Parameters | Base case | Adjusted values |
---|---|---|
Carbon tax ($ t−1 CO2) | 30 | 20, 40 |
CCR (%) | 60 | 50, 70 |
Distance (km) | 200 | 100, 300 |
Capital recovery factor (%) | 15 | 12.5, 17.5 |
Injection rate (t/a per well) | 14000 | 10000, 18000 |
O&M percentage (%) | 2.0 | 1.5, 2.5 |
Coal depth (m) | 500 | 400, 600 |
Methane price ($ m−3) | 0.30 | 0.25, 0.35 |
Fig. 13 Sensitivity analysis of annual gross profit based on changing the values of the listed parameters. |
Fig. 13 indicates that the carbon tax, CCR, and distance are the three main factors that affect annual gross profit. It is most sensitive to carbon tax because this parameter is the main revenue stream. The annual gross profit from the case with a $40 t−1 CO2 carbon tax is nearly 2.5 times higher than the base case. Interestingly, the influence of the CCR increase is much larger than that of a CCR decrease even though the ranges are the same. This indicates that the CCR should be set higher than 60% to maintain profitability. Annualization and injection rates were less sensitive factors, which depend heavily on the lifetime of the equipment and technology, respectively. These two factors will be the main considerations for calculating the economic forecast. Finally, reasonable changes in O&M percentage, coal depth, and methane price do not significantly influence annual gross profit.
• The power of one compressor will meet the compression demands for CCRs below 88.5%; above this threshold, another compressor will be needed, which will cause increase the capital costs significantly.
• The capital cost per unit of CO2 capture capacity decreases dramatically when the CO2 capture rate rises from 10% to 80%, then the trend stabilizes to a nearly constant value. This indicates that the optimal CCR to minimize capital cost is 80%.
• Total capital costs are dominated by cost for wells and infrastructures; for CCR above 50%, CO2 pipeline costs dominate the capital costs.
• An economical reasonable CCR range is proposed as 80–90% from an annual cost perspective.
• Energy costs grow most rapidly with increasing CCR, followed by costs for wells and infrastructure. The proportional constituent costs are ranked in the same order for all CCRs, even for those above 80%.
• An optimal CCR range of 70–80% was proposed based on methane cost.
• A CCR of 59.4% is a critical point for this particular CTO plant because complete fuel switching from coal to methane occurs.
• A CCR of 80%, results in a 58% reduction in CO2 emissions; of this reduction, CO2 sequestration and switching fuels account for roughly 66% and 34%, respectively.
• In the optimal CCR interval of 70–80%, a minimum carbon tax of $10 t−1 CO2 makes the project feasible; carbon taxes greater than $20 t−1 CO2 generates substantial profits.
• Carbon tax, CCR, and pipeline distance are significant when the annual gross profit was used as an index. The impacts of capital recovery factor and injection rate are relatively small.
This journal is © The Royal Society of Chemistry 2017 |